Kurau Field Trip V – Day 3

Free Image Hosting at www.ImageShack.us Finally did something, although not my original intention of coming here. I watched, under a scorching sun, the hassles of commisionning a new well. There seems to be so many elements of it went wrong and needed to be fixed right away. Elements like the placement of its various annulus valves and the calibration of its power supply control panel.

The valves were put in wrong positions by the drilling crew, and the wellservice guys needed to manually relocated them so that the well can be put into proper production state.

The supply control panel shows that the power used are somewhat below standard, so the seasoned engineers needed to know whether the panel were already calibrated or not.

Well..no smooth start for this one, that’s for sure

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: